Project overview

Location Rolleston

Project Stage 30 August 2021

Date of completion April 2022

Project Information

Isaac Construction has been awarded the contract for the construction of the Rolleston Town Centre Stage 2 Infrastructure and Transport package. This includes upgrading of services including the three waters, the creation of new roadways, the upgrading of existing carparks, and the construction of new public carparks.

Project Progress - 40%

Scope of Works

The Rolleston Town Centre Infrastructure Stage 2 Construction Package includes;

  • New water main to supply the Rolleston community South of the development,
  • Stormwater, wastewater infrastructure throughout to service the development
  • Electrical services including the installation of several Transformers
  • The upgrading of Wordsworth St, from the Moore St Intersection through to Rolleston Drive.
  • Resurfacing of the existing Community Centre Carpark and new tie ins
  • Construction of Carpark 3
  • Tie in of the Tennyson St Markham Way intersection
  • Temporary two-way vehicle connection between Carpark 3 and Wordsworth Street

Included in this scope are extensive infrastructure works, these include;

  • Street Lighting
  • Car Park Lighting
  • Electrical Infrastructure
  • Storm Water Systems
  • A New Potable Water Supply System
  • New Sewage Infrastructure
  • Telecoms
  • Security Cameras

Important notes for businesses and residents

  • Hours of work for the duration of this project will usually be from 7am – 6pm Monday through to Saturday
  • Access to businesses will remain in place, should our work temporarily impact an entrance way, an alternative passage will be created and clearly marked for vehicles and pedestrians
  • Access to residents’ driveways will be maintained where practical, any work planned across a resident’s driveway will be brief and at an agreed time
  • Roadside parking will be impacted by our work for each active work site. We aim to keep work sites small and compact where possible, however if you have specific access requirements that we need to consider (e.g. nurse/doctor visits, Meals on Wheels, planned property works etc.), please advise our communications manager and we will do our best to accommodate these needs
  • There will be increased noise, dust, and vibration levels as a result of our work
  • Work will have no impact on current power, telecommunications or gas services; however, the network is still fragile so please be prepared in case there is an unexpected service cut off
  • All site works are subject to favourable weather and on-site construction conditions
  • Rubbish and recycling will not change, please put bins out in the usual spots by 5:00pm the night before collection, our crews will move and return them if need be
  • Safety is our number one priority. Safety is also your responsibility too. Stay clear and stay alert, please keep children and pets a safe distance from any work site