Like any construction company, our shop window is the projects that we are involved in. From the initial planning to the final handover our work is very visible, ensuring that everything we do is in keeping with our values. We are very proud of the work we are doing, some of which is listed below.
The Park Terrace Stopbank project was the last of the earthquake damage projects in the Marlborough District Council budget. Due to time constraints Marlborough District Council need a contractor to finish the works within a 6 month window over summer before any potential winter flooding occurred.
The existing stopbank protecting the Moleta Vineyard was two-thirds eroded prior to works commencing. If this bank were eroded entirely, the river would flood, damage and erode the adjacent vineyard.
To protect the grapes lining Marfells Stream; this project required earthworks along the bank of the stream, the installation of gabion baskets to reduce water speed and scouring, and the construction of five culvert crossings to enable efficient transport of vineyard machinery.