Leighs Contract with Christchurch International Airport Ltd (CIAL) was to provide enhancement to the Regional Lounge area on the first floor of the Terminal Building & reconfigure access from this area through to Stands 15 & 16. It included constructing a new stairwell, escalator & covered walkway on the airfield apron.

Isaac Construction’s Civils Subcontract Package was to construct the new asphalt pavement around the new structures & included constructing new slot drains, carrier pipe & drainage structures to accommodate the changes in the apron pavement levels around the new stairwell & covered walkway.

The aircraft parking arrangements on the apron were also reconfigured & Isaac Construction undertook existing line mark removal & installation of the new line marking.